Board guide

Three decisions, in the order a board makes them

Each decision narrows the next. This is how we walk a board through them, with the questions to ask and what to vote on at each step.

  1. 01

    Step 1: Capacity: how much power is spare?

    Settled by measuring the building, not by opinion.

    Decision 1
  2. 02

    Step 2: Sharing: one pool or a circuit per stall?

    Decides how many chargers the spare power can run, and how fast they charge.

    Decision 2
  3. 03

    Step 3: Billing: who pays for the electricity?

    Decides who carries the cost, and what the rule says in writing.

    Decision 3

Decision 1 · Capacity

How much power does the building have spare?

Chargers are the easy part. The limit is the building's electrical service, the feeder to the garage and what everyone already uses on a winter evening. A load calculation under the electrical code turns those into one number: the amps left over. That number sets how many chargers the building can run, and whether the board needs to think about more service at all.

What the board should ask for

  • The load calculation, with the method named

  • Peak demand from the utility's data or a month of recording

  • Spare amps at the main service and at the garage subpanel

  • A plain statement of what more service would involve, if the building needs it

A black-and-white wall of round electric meters and disconnect switches in a building's meter room

Decision 2 · Sharing

Share the power, or reserve it stall by stall?

Reserving gives every stall its full rate and uses up the spare capacity quickly. Load sharing puts the chargers on a network that divides the spare amps between the cars plugged in: more stalls on the same service, and slower charging when many cars plug in at once. Many buildings mix the two, with a few reserved stalls, the rest shared and conduit in place for more.

What the board should ask

  • How many cars will plug in on a typical night?

  • Is a slower charge at the busiest hour fine for residents?

  • Should we pull conduit for stalls nobody has asked for yet?

  • What do the chargers do if the network connection drops?

A white charging post with its plug seated in a car, beside a building

Decision 3 · Billing

Who pays for the electricity?

A resident who charges uses electricity the association pays for, unless the building meters it. Metered billing runs through a software service the board chooses, separate from the chargers. Whichever answer the board picks, put it in a written rule, and have the association's attorney read the rule before the vote.

The three usual answers

  • Metered: each driver pays for their own kilowatt-hours

  • A flat monthly fee: simple to run, but light and heavy users pay the same

  • From the dues: the easiest, and every owner pays whether or not they drive an EV

Close-up of round electric meters mounted on a wall

The vote

What the board votes on

  • Approve the survey

    A site survey and load calculation, so the next two decisions rest on real numbers.

  • Choose a layout and a budget

    The layout from the proposal, shared, reserved or a mix, and the amount the association will spend.

  • Adopt the billing rule

    Who pays and how, written down, with the attorney's review before it passes.

Questions that come up in the meeting

What if only two owners want a charger today?

Pull the conduit and reserve the capacity for more, and install two chargers now. Adding stalls later is then chargers and wire, not another round of trenching.

Who owns the chargers afterward?

Usually the association, which is why the proposal says who maintains them and who pays. If a resident owns a charger under a board rule, the rule says so.

Does the building need an engineer's stamp?

Some jobs need one, such as a new service. The proposal says whether yours does, and what it adds.

Take the three decisions to your board on one page

The board packet puts the questions, the layouts and the billing choices on a single printable page. If you'd like the building's own numbers on it, we'll do the survey first.